ICT Migration

Care and experience to move your ICT infrastructure

With over three decades of trusted and reliable service in the Data Centre and ICT industry we understand the importance of ICT infrastructure and the risks posed to organisations when it comes time to relocate your infrastructure.

Our ICT Migration services are tailored to the individual customer’s circumstances and our experienced project teams work with in-house IT teams, Vendor teams or System Integrators to ensure all risks are mitigated and a smooth and seamless move is achieved.

We would like to thank Alliance SI for the excellent support and the prompt preparation of the server’s movement, which is in fact a tedious process to do.”
– Sivac Subbiah, NCSI

We are not just moving boxes. All our technicians carry electrical and ACMA qualifications, and are extremely experienced in working in Data Centre environments. Our methodologies for the relocation of ICT equipment have been established after years of relocation experience. Ensuring that equipment is protected at all times and that priority is given to the safe and efficient migration within project timeframes.

Alliance2013-09-101271Our relocation service includes:

  • Audit of the existing conditions
  • Development of patch matrix
  • Design of configuration
  • Preparation works at the destination site
  • Development of a detailed Manifest (Project Plan)
  • Development of roll back and other risk mitigation strategies
  • Dismantling and packaging equipment
  • Transportation local and interstate
  • Marine Cargo Insurance for your valuable equipment
  • Unpacking and installation of equipment
  • Patching, cabling and power requirements

“I was very happy with the work on the weekend and this has given me a great sense of confidence in the team and process.” Steven Rath, Fairfax Media

Over past years we have carried out significant relocation projects for various clients including Fairfax Media, NCSI, Foxtel, SingTel and Dimension Data and we pride ourselves on our ongoing relationships with our clients on the basis of impressive project performance.

An example of a recent project include the successful relocation of ten racks across Sydney with over one hundred items including one partially loaded EMC unit weighing over three hundred kilograms. Due to a tight outage window, twenty priority items were un-racked, transported, racked, patched and operational within the first three hours of the project. The remaining items were onsite within six hours ready to be racked, patched and rebooted and the entire project was completed in eighteen hours.

A further example involving an interstate migration is the relocation of 33 servers from Sydney to Brisbane. The project required same day relocation within 24 hours. All equipment was on site by 4.30am, racked by 6am and fully powered and online by 8am.

Talk to us about how we can help reduce your business risk